Wins with Schwenn: Aquatic Design

Completed this Fast Track Job w/ Little Time to Spare

The general contractor for this job was AD Owens. This job consisted of a 3,500 square foot interior build out on the 12th floor in downtown Orlando. Project consisted of a very high end lightening package. This was a very challenging project as all work had to be done from 6pm to 2am. But Schwenn came through and finished on time without any flaws. Schwenn Services never misses a deadline!