We have finished up the majority of these current jobs but are still working on a few. Take a look at the job details and photos.  

Mosque:
We are building a 35,000 sq/ft ground up building with site lighting and entrance lighting.
This building will have 2400amps of 3-phase 208volt power.
It will include a 2-story attached apartment for staff.
Building will be fully built-out with lighting and specialty power requirements.
It has power for fountains at the entrance.

OHEV:
We are building a 31,100 sq/ft ground up building with an attached 2-story 13,650 sq/ft ground up school.
This building has a 1000amp 480volt service with transformers for low voltage power.
This is a design build project that took 3-years from design to completion.
It has a state of the art lighting control system for the Sanctuary and occupancy light controls for the classrooms.
We installed and completed the HVAC control system back to the main controller.
This building has a full kitchen and elevator.

Rex Beach at Rollins College
Remolded a 2-story Dorm facility in 10-weeks at Rollins College.  This was a design Build Project.
This was a high end project with L.E.D. lighting and inverters for emergency lighting through-out the facility.
A new 800amp 208volt, 3-phase service was installed with new distribution panels on each floor.
It included (33) new student rooms, (5) restrooms, and meeting center, and small kitchen.
Low voltage CAT6 wiring and Coax for all the student rooms and meeting areas.
We installed a lighting protection system for the roof.

Rollins Hall
Remolded a 3-story Dorm facility in 10-weeks at Rollins College.  This was also a design build project.
This had new light fixtures through-out and new receptacles.
A new 400amp 208volt, 3-phase service was installed with new distribution panels on each floor.
It included (26) new student room, (3) restrooms, and meeting area with small kitchen.
Low voltage CAT6 wiring and Coax for all the student rooms and meeting areas.

Eye Physicians
This was a full interior of a 22,000 sq/ft eye exam facility.
It has a high end lighting system and lighting controls.
All new air conditioning and exhaust systems were wired and installed.
A new 800amp 208volt service was installed with sub-panels through-out the facility.

Children’s Ear’s Nose and Throat
This was a full interior of a 4,500 sq/ft facility.
It has new lighting and lighting controls.
A new 400amp 208volt, 3-phase service was installed.
Floor boxes were installed for retractable chairs and low voltage controls.
Installed low voltage wiring for door controls.

Cape Canaveral Hospital Project
Replaced variable drive disconnects for Air Handling Unit for the 3rd floor emergency room and exhaust fan located on rooftop.
Handled coordination with fire alarm contractor, low voltage controls, and hospital electrician to complete work.

Golfview Elementary
Installed a new 45KVA transformer for a 10-ton roof top air conditioner and provided power for a complete system.

Controls
Installed a complete HVAC control system for Congregation OHEV.
Installed a complete HVAC control system for the new Coliseum at Holyland Orlando.


Please visit our website at www.schwennservices.com for more details on all our electrical services.